Hillside Lake Micro Wetland Basin Project (Permitted by the NYSDEC and the U.S. ACOE)

This Project will allow the construction of 3 small artificial wetlands to remove sediment.  The Basins are proposed to be located at Locations "A", "B" and "C" of the Dredging Project diagram below.


Hillside Lake Dredging Project (Permitted by the NYSDEC and the U.S. ACOE)

This Project will remove a total of approximately 100 cubic yards of sediment from the Lake at several outfall locations.

 


Hillside Lake Water Quality Improvement Project (Permitted by the NYSDEC and the U.S. ACOE)

After years of planning and attaining State Grants, the Hillside Lake Water Quality Improvement Project will be constructed this spring.

The project consists of the construction of an artificial wetlands in vicinity of the beach area, and the redirection of street drainage towards the wetland.

 

NYSDEC generated Notes from the April 25, 2018 meeting on Hillside Lake

 

May 5, 2017 Hillside Lake Water Quality Improvement Project Bid Opening - UNOFFICIAL RESULTS

 

April 20, 2017 Contractor's Pre-Bid Meeting Sign-up Sheet

Addendum No. 1 was distributed to all Contractors who attended and signed-in at the Pre-Bid Meeting via e-mail on April 27, 2017.  If any Contractor on this list did not receive Addendum No. 1, please contact the Town.